November 5, 2026
In mid-October, the intersection of Koval Lane and Flamingo Road closed to traffic 24 hours a day from Sunday night, Oct. 11, through 9 p.m. Friday, Oct. 16. Crews used those days to set the temporary Flamingo Vehicular Bridge in place over the circuit. Nearby businesses stayed open, but parts of the north-side Flamingo sidewalks closed for pedestrian-bridge work. Two weeks later, FOX5 reported traffic backing up on Koval outside Ellis Island and a bottleneck at Koval and Flamingo, with the bridge already up.
That bridge has to come down again. The organizer's preliminary teardown schedule closes Koval and Flamingo around the clock again from 9 p.m. Dec. 13 to 9 p.m. Dec. 18. The Formula 1 Heineken Las Vegas Grand Prix runs Nov. 19 through 21. For anyone who drives the east side of the Strip, though, the road calendar runs into late December, and the toughest week falls in the middle of holiday season.
Race week is the most predictable part of the whole stretch, because the closures follow a published timetable. The Venetian's guest guide lists these anticipated closure windows for Las Vegas Boulevard, Sands Avenue and the other circuit roads, marked subject to change:
On the three race days, the guide says roads start closing at 1 p.m., are fully closed by 3 p.m., and reopen between midnight and 3 a.m. Pedestrian paths and footbridges stay open 24/7. If you have to drive across the circuit during a closure, the guide routes cars over the temporary bridge at Flamingo and Koval, then west on Flamingo to LINQ Lane, which becomes Kreuger Drive. Outside the closure windows, the guide still expects heavier than usual foot and car traffic around the Strip.
Current times are posted on the organizer's transportation site, which also sends weekly updates by text if you send F1LV to 31996.
The bus schedule shows how far the race's effects reach past race weekend. On its alerts and detours page, the RTC of Southern Nevada says the Deuce and Routes 119, 202 and 203 are expected to run on major detours from Tuesday, Nov. 17, through Wednesday, Nov. 25. The RTC said it would post full detour routes and stop lists before race week.
Some stops close for longer than that. Seven Route 119 stops on Koval stay closed around the clock through Dec. 18. Stops 2505, 2504 and 2572 on Sands and Spring Mountain stay closed through Nov. 25. The Dec. 18 date matches the last day of the Flamingo bridge teardown, so the Koval stops reopen when the bridge work ends.
The organizer's resource index lists post-race track dismantling from Nov. 23 to Dec. 23, with weekly maps through the week of Dec. 21. The weekly maps carry a "preliminary schedule" label. Here is what they show for public roads:
| Dates | Location | Planned impact |
|---|---|---|
| Nov. 23 at 12 a.m. to Nov. 25 at 12 a.m. | Las Vegas Boulevard | Barrier removal; two lanes closed 24 hours, one lane open in each direction |
| Nov. 23 to 25 | Koval Lane | Closed 7 a.m. to 5 p.m. |
| Through Dec. 4 | Sands Avenue and Las Vegas Boulevard | Sands barrier removal; overnight lighting work on the Boulevard |
| Dec. 8 to 11 | Harmon Avenue | Topgolf vehicle bridge comes down; both directions closed 9 p.m. to 8 a.m., open in daytime |
| 9 p.m. Dec. 13 to 9 p.m. Dec. 18 | Koval Lane and Flamingo Road | Flamingo vehicle bridge comes down; intersection closed 24 hours, sidewalk closures |
| Nov. 23 to Dec. 24, then Dec. 26 to 29 | Southbound Las Vegas Boulevard near Bellagio | Bellagio Fountain Club; two lanes closed 24 hours, then one lane, sidewalk closed |
The closures get shorter week by week. Each road also has its own end date, and they arrive a few days or weeks apart.
Most teardown work happens overnight or uses a single daytime shift. The Flamingo bridge removal is different. It is five straight days with the intersection closed around the clock, and it runs from a Sunday night to a Friday night in the middle of December. The Week 16 map adds a temporary signal at Koval and Flamingo and sidewalk closures for removing both the vehicle bridge and the pedestrian bridge. It also notes that access to all properties will be provided.
The December closure matches the October one. Both are five-day, round-the-clock shutdowns of the same intersection, one to build the bridge and one to remove it. That length is already much shorter than it was. In August 2025, the Las Vegas Review-Journal reported that the 2025 plan called for five days to build the Flamingo bridge, down from seven days in 2024 and 10 in 2023. The 2026 schedule keeps that five-day window for both the build and the removal.
If your regular routes to work, the airport side of the valley, or holiday errands cross Koval and Flamingo, the week of Dec. 13 is the one to mark on the calendar. Harmon's overnight closures the week before, Dec. 8 to 11, are easier to work around because the road is open in daytime.
The last closure on the calendar isn't on the east-side circuit roads. It's on the Strip in front of Bellagio. The 2026 transportation page listed the Bellagio Fountain Club closing two southbound Las Vegas Boulevard lanes and the sidewalk 24 hours a day from Sept. 14 to Nov. 9, with four northbound and three to four southbound lanes left open. The teardown maps bring the two-lane closure back from Nov. 23 to Dec. 24, then drop to one lane closed around the clock from Dec. 26 to 29, with the sidewalk still closed.
So the official track teardown ends Dec. 23, but southbound Boulevard traffic near Bellagio stays narrowed until nearly New Year's. During the build, one Deuce stop at Bellagio and Cosmopolitan stayed closed 24/7 through Nov. 9. Checking that stretch on the RTC alerts page before a December trip down the Strip is a reasonable step.
If you'd rather spend Nov. 20 to 22 away from the circuit, these are the options:
For anyone who wants to be at the track, Thursday single-day general admission was listed at $81 in the organizer's July announcement.
After Nov. 22, the remaining dates are road dates. Nov. 25 is when the Deuce and three other routes are expected to come off their major detours. Dec. 13 to 18 is the round-the-clock Koval and Flamingo closure. Dec. 29 is the last day of the Bellagio lane closure. Everything on the teardown maps is preliminary, so check the transportation site the week before each one.
If you're comparing parts of the valley and your daily drive would cross Koval, Flamingo or the Strip, the Grand Prix calendar is worth adding to that comparison. Lisa Vaughn has lived in the valley for 37 years and can walk you through how race season affects the commute from the neighborhoods on your list. Let's Connect.